Toto

Double Paddle Canoe, Page 2

Back Next Page

After stitching and checking everything for square, the permanent bulkheads were filleted in place with epoxy putty, and the seams have been "spot welded" so that the zip ties can be removed before full-seam fillets and tape are applied.

 

Interior seams filleted and taped.

 

Exterior seams filled and taped.  Since there was a lot of epoxy already on much of the hull surface, I went ahead and coated the whole exterior to better seal it.

 

Back Next Page